Week 1 included lots of painting and prep for addition as we wait for the building permit.
 |
| Bricks off where master bedroom addition will go |
 |
| The AC unit has seen its better days. Removed and awaiting a new AC unit. |
 |
| Back patio door into rec room replaced. Awaiting handle and painting. |
 |
| Back patio door into den replaced. Awaiting handle and painting. |
Upstairs is well on its way to being fresh with new paint and fixtures.
My FABULOUS husband has painted all the ceilings and several walls.
My FABULOUS mother in-law and Drew's aunt have painted lots of walls, doors and trim.
My FABULOUS father-in-law has hung lots of new fixtures.
Our FABULOUS contractors- thanks Kevin Corum!- have started patching some trouble areas.
 |
| Upstairs hallway walls and ceiling painted. Trim work to be done. |
 |
| Andrew's big boy room with new fixture- Drew insisted upon a fan. I beg to differ.... |
 |
| Andrew's big boy room with fresh ceiling paint, wall and trim paint. Still in progress. |
 |
| Nursery with fresh paint and fixture. |
 |
| A little water damage under the window being patched a fixed in the nursery. |
 |
| Don't forget the closet painting.... |